For more info about each project Value, kindly send us a message using our contact form

Construction of Duress By-Pass and Vora Interchange, Road Project, Phase 1 – Albania.

Client: Ministry of Public Works and Transport– Albania
Contract no.: Duress 1
Commencement date: 26/05/2009
Completion date:  16/02/2015

Brief Description of the project : Construction of a highway of 10 Km length with four lines with affiliated service roads, roundabouts, underpass and two interchanges along with 4 Km of linking road by 4 lines.

Construction of Duress By-Pass and Vora Interchange, Road Project, Phase 2. – Albania.

Client: Ministry of Public Works and Transport – Albania
Contract no.: Duress 2
Commencement date:  10/12/2012
Completion date:  10/12/2015
Completion date:  31/03/2012

Brief Description of the project : Construction of two new post tensioned concrete flyover Bridge. Each structure consists of a dual 2-lanes carriageway with two lanes of 2x2x3.75 meters provided plus 2×0.5 meters asphalt shoulders…

Travaux de Construction et de Bitumage de la Route Linguère – Matam, Section Patouki – Ourossogui (41km).- Senegal

Client: Agence Autonome des Travaux Routiers – AATR – Senegal
Contract no.: TA3/689/AGR
Commencement date:  July – 2012
Completion date:  February – 2014

The construction of 41km of dual road of 9m width including Earthwork ,excavation and filling ,sub base preparation and base formed with crushed stone treated cement and asphalt surfacing of 5cm thick….


Travaux d’Aménagement et de Bitumage de la Route Médina Gounass – Frontière Guinée (70km).- Senegal

Client: Agence Autonome des Travaux Routiers – AATR – Senegal
Contract no.: TA3/547/ATR
Commencement date: Nov. – 2009
Completion date:  July – 2011

Brief Description of the project : The construction of 70km of dual road of 10.50m width including Earthwork ,excavation and filling ,sub base preparation and base formed with crushed stone treated with 3% of cement and asphalt surfacing of 5cm thick…


Travaux de Réhabilitation et d’Elargissement de la Route Mansoa – Farim (54km). – Guinea Bissau

Client: Infrastructure Ministry – Guinea-Bissau
Contract no.: 11/TR/2012
Commencement date:  August – 2012
Completion date:  August – 2013

Brief Description of the project : The construction of 54.85km of dual road of 10.50m width including Earthwork ,excavation and filling ,sub base preparation and base formed with crushed stone treated cement and asphalt surfacing of 5cm thick…

Travaux de Réhabilitation de l’Avenue de Libération à Kinshasa – Congo

Client: Ministère des infrastructures et Travaux Publics et Reconstruction – Congo
Contract no.: MITPR/CI/002/SV/2008
Commencement date:  15/04/2008
Completion date:  26/03/2011

Brief Description of the project : Rehabilitation of 13km of existing two ways primary road of 12m width and rehabilitation of the street furnitures along with the street lighting poles…

Emergency Maintenance and Miscellenaous Works to Roads at Hawally Governorate – State of Kuwait

Client: Ministry of Public Works – Kuwait
Contract no.: MS/R/229
Commencement date:  31/08/2010
Completion date:  31/08/2012

General Maintenance of Roads and Squares at Hawalli Governorate – State of Kuwait.

Client: Ministry of Public Works – Kuwait
Contract no.: MS/R/194
Commencement date:  30/11/2008
Completion date:  28/09/2010

Brief Description of the project :Milling and asphalt resurfacing to existing roads in different location at Hawalli ,Cleaning &CCTV survey + renovation of storm water network and miscellaneous works.

Emergency Maintenance and Miscellenaous Works to Express Roads – State of Kuwait.

Client: Ministry of Public Works – Kuwait
Contract no.: MS/R/310
Commencement date:  10/11/2014
Completion date:  01/11/2016

Brief Description of the project :The works include Milling , asphalt resurfacing and patch repairs.

General Maintenance of Highways – State of Kuwait.

Client: Ministry of Public Works – Kuwait
Contract no.: MS/R/300
Commencement date:  05/12/2014
Completion date:  05/12/2016

Brief Description of the project :The works include Milling of defected asphalt , resurfacing , patch repairs along with the construction of drainage reinforced concrete ditches as well.

Construction of Duress By-Pass and Vora Interchange, Road Project, Phase 1 – Albania.

Client: Ministry of Public Works and Transport– Albania
Contract no.: Duress 1
Commencement date: 26/05/2009
Completion date:  16/02/2015

Brief Description of the project : Construction of a highway of 10 Km length with four lines with affiliated service roads, roundabouts, underpass and two interchanges along with 4 Km of linking road by 4 lines. The highway consists of a dual 2-lanes carriageway with two lanes 2x2x3.75 m provided plus 2×0.5 m asphalt shoulders in both directions and separated by a green stretch of 1.8 m width with pedestrian on both side of 1.8m width.  In addition two parallel road on the each side of 5.5 m and sidewalk of 1.5 m width. In total is a road of 35.4 m width in addition to 4 new roundabouts, one railway underpass and rehabilitation of 2Km of linking existing road.

Construction of Duress By-Pass and Vora Interchange, Road Project, Phase 2. – Albania.

Client: Ministry of Public Works and Transport – Albania
Contract no.: Duress 2
Commencement date:  10/12/2012
Completion date:  10/12/2015

Brief Description of the project : Construction of two new post tensioned concrete flyover Bridge.  Each structure consists of a dual 2-lanes carriageway with two lanes of 2x2x3.75 meters provided plus 2×0.5 meters asphalt shoulders in both directions and separated by a stretch 1.8 m width and pedestrian on both sides 2×1.5 m width.  The length of each structure is 100 m and in both sides ramps with total length of 600 m, in addition the project includes the construction of a trapezoidal irrigation channel of 1 Km each paved by reinforced concrete.

Travaux de Construction et de Bitumage de la Route Linguère – Matam, Section Patouki – Ourossogui (41km).- Senegal

Client: Agence Autonome des Travaux Routiers – AATR – Senegal
Contract no.: TA3/689/AGR
Commencement date:  July – 2012
Completion date:  February – 2014

Brief Description of the project : The construction of 41km of dual road of 9m width including Earthwork ,excavation and filling ,sub base preparation and base formed with crushed stone treated cement and asphalt surfacing of 5cm thick. Drainage network and reinforced concrete box culverts construction along the 41km length The work includes kerbstones, interlock tiles, Marking and sign traffic installation.

Travaux d’Aménagement et de Bitumage de la Route Médina  Gounass – Frontière Guinée (70km).- Senegal

Client: Agence Autonome des Travaux Routiers – AATR – Senegal
Contract no.: TA3/547/ATR
Commencement date: Nov. – 2009
Completion date:  July – 2011

Brief Description of the project : The construction of 70km of dual road of 10.50m width including Earthwork ,excavation and filling ,sub base preparation and base formed with crushed stone treated with 3% of cement and asphalt surfacing of 5cm thick. Open channels drainage and reinforced concrete box culverts construction along the 70km length .The work includes kerbstones, interlock tiles, Marking and sign traffic installation.

Travaux de Réhabilitation et d’Elargissement de la Route Mansoa – Farim (54km). – Guinea Bissau

Client: Infrastructure Ministry – Guinea-Bissau
Contract no.: 11/TR/2012
Commencement date:  August – 2012
Completion date:  August – 2013

Brief Description of the project : The construction of 54.85km of dual road of 10.50m width including Earthwork ,excavation and filling ,sub base preparation and base formed with crushed stone treated cement and asphalt surfacing of 5cm thick. Drainage network and reinforced concrete box culverts construction along the 54.85km length The work includes kerbstones, interlock tiles, Marking and sign traffic installation.

Travaux de Réhabilitation de l’Avenue de Libération à Kinshasa – Congo

Client: Ministère des infrastructures et Travaux Publics et Reconstruction – Congo
Contract no.: MITPR/CI/002/SV/2008
Commencement date:  15/04/2008
Completion date:  26/03/2011

Brief Description of the project : Rehabilitation of 13km of existing two ways primary road of 12m width and rehabilitation of the street furnitures along with the street lighting poles.

The project includes:earthwork,excavation and removal of existing asphalt and sub base.Relevelling the sub base and the base,compaction and asphalt surfacing of 10cm thick ) 6cm layer of binding course and 4cm of wearing course ).The work includes kerbs installation,interlock tiling,marking,traffic signs and signals and installation of street lighting poles.

Emergency Maintenance and Miscellenaous Works to Roads at Hawally Governorate – State of Kuwait

Client: Ministry of Public Works – Kuwait
Contract no.: MS/R/229
Commencement date:  31/08/2010
Completion date:  31/08/2012

General Maintenance of Roads and Squares at Hawalli Governorate  – State of Kuwait.

Client: Ministry of Public Works – Kuwait
Contract no.: MS/R/194
Commencement date:  30/11/2008
Completion date:  28/09/2010

Brief Description of the project :Milling and asphalt resurfacing to existing roads in different location at Hawalli ,Cleaning &CCTV survey + renovation of storm water network and miscellaneous works.

Emergency Maintenance and Miscellaneous Works to Express Roads – State of Kuwait

Client: Ministry of Public Works – Kuwait
Contract no.: MS/R/310
Commencement date:  10/11/2014
Completion date:  01/11/2016

Brief Description of the project : The works include Milling , asphalt resurfacing and patch repairs.

General Maintenance of Highways – State of Kuwait

Client: Ministry of Public Works – Kuwait
Contract no.: MS/R/300
Commencement date:  05/12/2014
Completion date:  05/12/2016

Brief Description of the project : The works include Milling of defected asphalt , resurfacing , patch repairs along with the construction of drainage reinforced concrete ditches as well.